Industrial Math skills test For light industrial hiring.
Counts, fractions, decimals, percentages, unit conversion, time, scrap, yield and rates, with a calculator.
A test shows how someone did on the questions asked. It does not prove hands-on skill, equipment certification or completed safety training.
At a glance
- Time estimate
- 12 to 15 minutes
- Included in
- 4 of 4 position packages
- Price
- $15 per candidate
What it checks
Counts, fractions, decimals, percentages, unit conversion, time, scrap, yield and rates, with a calculator.
Skills covered
Shop-floor math with a calculator: counts, cartons and pallets, parts remaining, percent defective and percent of target, rates and hours, fractions of an inch, inches to millimeters, simple mixing ratios. For production and warehouse jobs.
Packages that include it
Recruiters pick the position. The package brings this test along with the others the job needs.
General Production
See the General Production package
- Safety Awareness
- Industrial Math
- Reading and Following Directions
32 to 40 minutes
General Warehouse
See the General Warehouse package
- Safety Awareness
- Warehouse Tasks
- Industrial Math
30 to 37 minutes
Production with Measurement
See the Production with Measurement package
- Safety Awareness
- Industrial Math
- Reading and Following Directions
- Measurement
42 to 52 minutes
Machine Operator
See the Machine Operator package
- Safety Awareness
- Industrial Math
- Reading and Following Directions
- Machine Operation
44 to 55 minutes
One price: $15 per candidate on Pay as you go.See pricing
See what a client receives
Every package produces one report: each skill next to your benchmark, a plain-language summary and a list of anything not tested.
Sample report
A fictional candidate, scored by skill against a benchmark.
See it with your own job descriptions.
Not sure which tests a job needs? Paste the job description in a demo and see what GuideSkills suggests.